Söderköping, E22 Road Bridge

Motala, Söderköping

Bascule bridge. The bridge is remote controlled from Söderköping Lock.

The E-22 Bridge opens every whole and half hour during hte canal's peak season. The last bridge opening is at 6 PM. On Fridays and Sundays the bridge only opens at whole hours between 3 and 6 PM. This also applies on the Thrusday Before Midsummer.